Landlord Electrical Services

EICRs, alarms, remedials and void works for landlords and letting agents, with reports delivered ready to share with tenants.

Electrician testing a circuit with a multimeter

Landlord Electrical Safety Certificates and Services in Watford

Renting out a property comes with clear electrical duties, and the paperwork has to stand up if a tenant, council or insurer asks for it. Ayan Electricians provides the landlord electrical safety certificate in Watford that the law requires, along with the alarm work, remedial repairs and between-tenancy jobs that keep a rental compliant.

We work with individual landlords, portfolio owners and letting and estate agents across Hertfordshire and North West London. Agents can book us directly, arrange access with tenants and receive reports by email, ready to forward. Landlords who live away from the area get photos and plain-English explanations of anything we find, so you can make decisions without visiting.

Our electricians work to BS 7671, are fully insured and provide written quotations for any remedial work before it starts. You will always know what is a legal requirement and what is simply a recommendation.

What We Do for Landlords

Mains smoke alarm installed by Ayan Electricians

Your Legal Duties as a Landlord in England

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require private landlords to have the fixed electrical installation inspected and tested by a qualified person at least every five years, or sooner if the previous report says so. The inspection results in an Electrical Installation Condition Report, the document most people call the landlord electrical safety certificate.

Once you have the report you must:

  • give a copy to existing tenants within 28 days of the inspection
  • give a copy to new tenants before they move in
  • supply a copy to the local authority within seven days if it asks for one
  • complete any required remedial work within 28 days, or sooner if the report specifies

Similar standards now apply to social housing in England, covering new tenancies from 1 December 2025 and existing tenancies from 1 May 2026, so housing associations and councils face the same five-yearly cycle. We can help social landlords plan inspections across their stock.

Understanding Your EICR Codes and Remedial Work

An unsatisfactory EICR is not a disaster, but it does start a clock. Each observation is coded. C1 means danger is present, such as exposed live parts, and we make it safe before leaving. C2 means potentially dangerous, for example missing RCD protection for sockets or a lack of main protective bonding to gas and water pipes. FI means further investigation is needed without delay. Any C1, C2 or FI makes the report unsatisfactory.

C3 means improvement recommended. It does not fail the report and is not a legal requirement, though it is worth planning for. We separate these clearly so you are never pressured into optional work.

Once remedials are done, the regulations require written confirmation from the electrician that the work is complete and the installation now meets the standard. You must provide that confirmation, together with the original report, to the tenant and to the local authority within 28 days of completion. We issue it as standard. For the inspection itself, see our EICR Watford page.

Book Your Landlord EICR

Call 01923 372423 or send your property details through the form for a free, written quotation.

Alarms, Appliances and Void Works Between Tenancies

The Smoke and Carbon Monoxide Alarm (Amendment) Regulations 2022 require a smoke alarm on every storey used as living accommodation and a carbon monoxide alarm in any room with a fixed combustion appliance, such as a gas boiler or log burner. We fit mains-powered, interlinked alarms that reduce the chance of tenants removing batteries, and our Fire Alarms page explains the options for HMOs and blocks.

Portable appliances you supply, such as fridges, washing machines and microwaves, are not covered by the EICR. PAT testing is not specifically required by law for most single lets, but it is a straightforward way to show you have checked the equipment you provide, and some councils require it as part of HMO licensing. See PAT Testing.

The empty weeks between tenants are the best time for disruptive jobs: replacing an old fuse board, adding sockets, upgrading lighting or carrying out a partial rewire. We schedule work around check-out and inventory dates to keep voids as short as possible.

Working With Letting Agents and Portfolio Landlords

Agents tell us what makes their life difficult: chasing contractors for reports, tenants who never received the paperwork, and quotes for remedial work that arrive after the deadline has passed. We set things up to avoid all three.

You get the EICR by email, usually within a few working days of the inspection, along with a separate written quote for any remedials. Once you approve, we arrange access with the tenant and send the completion confirmation as soon as the job is signed off. For landlords with several properties, we can help you track renewal dates so nothing slips through. Larger buildings with communal areas may also need emergency lighting and landlord supply checks, which our Commercial team covers.

How It Works for Landlords

Step 1

Book the Inspection

Landlord or agent books a date; we contact the tenant to confirm access.

Step 2

Inspect & Test

Every circuit is inspected and tested to BS 7671, with photos taken of any issues found.

Step 3

Report & Quote

You receive the EICR plus a written quote for any C1, C2 or FI items.

Step 4

Remedials & Sign-Off

We complete agreed work and issue written confirmation ready to share with tenants and the council.

Frequently Asked Questions

At least every five years in England, or sooner if the previous EICR recommends a shorter interval. Some properties, such as older HMOs or installations in poor condition, may be given a shorter period. The date of the next inspection is stated on the report itself.

You must complete the remedial work within 28 days, or sooner if the report says so, then obtain written confirmation from a qualified person that the work is done. That confirmation and the original report go to the tenant and, within 28 days of completion, to the local authority.

Not necessarily. A valid EICR covers the property for the period stated on it, typically five years, regardless of tenancy changes. You must give a copy to each new tenant before they move in. It is still sensible to carry out a visual check between tenancies.

Yes. Many of our landlord jobs are booked by agents. We liaise directly with tenants for access, send reports and quotes to the agent, and copy in the landlord if requested. You stay informed without having to coordinate visits yourself.

The EICR covers the fixed wiring, consumer unit, sockets, switches and fixed equipment. Smoke and carbon monoxide alarms are a separate legal requirement, and portable appliances are covered by PAT testing. We can carry out all three on the same visit.

A C1 means there is an immediate risk of injury. We make it safe on the spot, usually by isolating the affected circuit or replacing the dangerous item, and explain what has been done. You will then receive a quote for the permanent fix.

Related Services

Get In Touch With Ayan Electricians

Call 01923 372423 or send your property details through the form for a free, written quotation.

Request A Quote